Power Shift
Engineers designing a Manhattan skyscraper with offices in the lower floors and residences in the upper found that they had to employ several unusual methods to accommodate client needs....

Pressure Relief
When the two basins making up a 90 acre reservoir in New York needed to be emptied and cleaned, engineers decided to use the 2,750 ft (840 m) long concrete wall dividing them as a dam....

Lesssons Learned from Experience Dealing with Risks of Extreme Events: Part II
For every known IS vulnerability, there is a matching countermeasure. However, we do not know all IS vulnerabilities. The following tasks are geared towards identifying IS vulnerabilities,...

A Paradigm Shift in Irrigation Management
In coming decades, irrigated agriculture will be called upon to produce up to two thirds of the increased food supply needed by an expanding world population. But the increasing dependence...

Leakage Control?Finding a New Resource from the Existing One
It is estimated that by the year 2005, one person in two will have an insufficient supply of one of the world's most precious elements: water. Worse still, it is predicted that this shortage...

Guidelines for Testing Large Seismic Isolator and Energy Dissipation Devices
This report outlines the HITEC Technical Evaluation Plan for large seismic isolator and energy dissipation devices. The plan is designed to characterize the fundamental properties and...

Control of Microorganisms in Drinking Water
Prepared by the Water Supply Engineering Technical Committee of the Infrastructure Council of the Environmental and Water Resources Institute of ASCE. ...

Deep Freeze
In engineering, overcoming a failure can sometimes be more instructive than completing a project with unqualified success. Such was the case with the collapse and repair of a force main...

Comparison of Hydrodynamic Parameters for a Floating Breakwater
The U. S. Army Engineer Research and Development Center is in the process of developing a Rapidly Installed Breakwater System (RIBS) for use in Joint Logistics Over the Shore Operations...

Quality Control Test for Prestressing Wires in Concrete Pressure Pipe
Prestressed concrete cylinder pipe (PCCP) was introduced in 1942 as a high pressure capacity conduit for water transmission. The principal element of the design and construction that imparts...

Tunnel with Vision
Two tunnel boring machines that are being used to bore a pair of 6.6 km long tunnels under the Westerschelde estuary in the southern Netherlands must dig through loose sand and sticky...

A Grand New Bridge
Approximately 65 km south of Seoul, rising above the Asan Bay, the Seohae Grand Bridge now stands as the longest bridge in South Korea. The 9.4 km long cable-stayed bridge, which runs...

High Resolution Pressure Measurements on Roofs of Low Buildings
Describing an instrumented module which was built with extremely high pressure tap density to use as a component of a roof or wall....

Dynamic Response of Lattice Towers and Guyed Masts
Prepared by the Task Committee on the Dynamic Response of Lattice Towers of the Technical Committee on Special Structures and the Technical Administrative Committee on Metals of the Structural...

Water In, Water Out
Moving water into and out of the Eastside Reservoir, which will be the largest body of freshwater in southern California, requires some of the largest pumping and water conveyance systems...

On Martian Soil
Discussions are ongoing about how and when to build human settlements on other worlds. Many scientific discussions have focused on settlements on Mars, and how the initial colonists would...

Environmentally Friendly Transport of Reservoir Sediment for Beach Nourishment with EDDY Pump
Sand impounded behind hydroelectric, flood-control and debris dams not only diminishes the intended function of the reservoir, but also starves downstream coastline by denying natural...

Towers in Motion (available in Structural Engineering Special Section only)
Undersea towers are typically designed to rigidly resist the forces of water and wind. But one type of tower is designed to be flexible and, rather than rely on its platform strength to...

Monitoring the Fresh Kills Landfill (Available in the Geoenvironmental Special Section only)
A unique system has been developed to assess the stability of the Fresh Kills Landfill, in New York City, using more than 260 geotechnical instruments and automatic processes. The system...

Sprinkler Irrigation
In sprinkler irrigation, water is applied to the soil using a pressurized piping system with nozzles, jets, or perforated pipe that sprays the water into the air. These sprinkler devices...

 

 

 

 